LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures

Product Details
Customization: Available
After-sales Service: 24 Hours on Line Service
Warranty: 1year
Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
Others
OEM/ODM Availability
Yes
  • LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
  • LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
  • LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
  • LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
  • LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
  • LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
Find Similar Products

Basic Info.

Model NO.
LNG-80
Certification
MID, ISO9001: 2000, CE
No. of Gas Hose
Two
Operation Mode
Self-help
Applicable Car Model
LNG
Delivery Times
90days
Transport Package
40feet Container
Specification
SMC-1500L/H
Trademark
SMC
Origin
China
HS Code
8479899990
Production Capacity
10000set Per Year

Product Description

              LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
LNG Dispenser Technical Parameter:
Item Specification
Flow Range 3-80kg/min
Max Working Pressure 1.6MPa
Working Temperature -30-+55ºC
Inlet Flow Meter Type 1" low temp mass flow meter E+H/Emerson
Measurement Accuracy ±1%
Minimum Reading Graduation Value 0.01kg or Nm3,L
Single Measurement Range 0-9999.99kg(or Nm3,L)
Cumulative Measurement Range 0-99999999.99kg(or Nm3,L)
Filling Hose 1" stainless steel soft pipe 4m
Return Air Hose 1/2" stainless steel soft pipe 4m
Networking Interface RS485(use photoelectric isolation 8KV ESD)
Electrostatic Discharge Immunity 4class 8KV
Electrical Fast Transient Pulse Group Immunity 4 class 4KV
Surge Immunity 4 class 4KV
Power Supply AC220V<200W
Explosion-proof Grade ExdibellBT 4Gb
Weight About 325kg
Overall Structure
The LNG dispenser consist of a shell, computer controller,display screen, mass flow meter,one-way valve,safety valve, pressure sensor, explosion-proof junction box, LNG connector(liquid nozzle base,liquid nozzle head),stainless steel pipes and other components.
LNG Dispenser LNG CNG Gas Station Dispensing Stations ManufacturesWorking Principle
The LNG enters teh dispenser through the transmission pipeline, flows through the mass flow meter, the control valve,the metal hose,the LNG dosing gun, and finally flows into the vacuum bottle of the the filled car. The mass of flow meter measures the physical signals of the density and mass of the liquid flowing through the dispenser, and is converted into an electrical pulse signal by the signal converter and send to the computer controller. The computer automatically calculated the corresponding volume.The amount will be shown to the customers on the display screen to complete a dosing and metering process.
LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
Pipeline Connection
Connect the incoming liquid process pipeline, return gas process pipeline and venting process pipeline as shown in Figure 3-2
Connect the filling pipe, return pipe, filling gun and return air gun of the dispenser as shown in Figure 3-3.

LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
LNG Mass Flow Meter/LNG Plug-in Gun
Patent ID: ZL2012201210130
The patent cancels the "pre-cool" button set by the traditional LNG gas machine, and the operator only needs to insert the plucking gun into liquid port of the car LNG cylinder . Press the "gas" button, the system automatically performs pre-cooling process. After pre-cooling successful, switch to the filling process, no manual operation is required during the process.

LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
LNG Quantitative Loading System
product description:
The LNG quantitative load system is designed for the demand for the quantitative filling control and information construction of the LNG plant. It adopts smart card technology, automatic control technology, computer and its communication technology to realize the full automation control of the LNG trailer. Safety, efficiency and accuracy of information.
Product main features:
1. Support three pre-quantitative settings (control system remote delivery, password loading; controller local preset loading/IC card input mode);
2. Flow automatic adjustment, quantitative filling control;
3. Multi-safety interlock protection (pressure / temperature / flow overrun, electrostatic ground / lightning protection design, post-discipline)
4. Dynamic monitoring of the production process of loading
5. Data communication function (can enter DCS)
6. ESD function
7. Loading business management and report management

LNG Dispenser LNG CNG Gas Station Dispensing Stations ManufacturesLNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
LNG/L-CNG Filling Station Process Flowchart
  
  1. Unloading Process: Transfer LNG(liquid natural gas) from the tank truck to the LNG storage tank of the gas station through the LNG submersible pump skid(including the unloading truck and the tank booster) at the gas filling station.
  2. Pressurization Process: After unloading, the LNG is pressurized to above 23Mpa by the LNG high pressure pump skid, and then gasified into CNG(high pressure natural gas)by the high pressure vaporizer skid(including high pressure vaporizer, high pressure water bath electric heating reheater, and sequence control panel), and enter the high pressure gas cylinder group for storage.
  3. Gas Filling Process: When the pressure in the high pressure gas cylinder group is too low to be able to refill normally, the high pressure pump restarts and vaporizes to replenish and pressurize the high pressure gas cylinder group, and refill the car.
  4. Liquid Filling Process: LNG is pressurized to about 1.6Mpa by the LNG submersible pump skid, and LNG is filled into the car bottle group through the pipeline and LNG dispenser.
LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures
The General Process Flow Chart is as follows:
 
LNG Dispenser LNG CNG Gas Station Dispensing Stations ManufacturesLNG/L-CNG Refuel Gas Station Equipment: LNG Dispensing Station Flowchart
LNG Dispenser LNG CNG Gas Station Dispensing Stations ManufacturesLNG/L-CNG Refuel Gas Station Control System  
LNG/L-CNG Refuel Gas Station Testing:

LNG Dispenser LNG CNG Gas Station Dispensing Stations Manufactures

Welcome all the foreign customers come to visit our factory and LNG/L-CNG Gas Refueling Station Working Site.Thanks.

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier